1 MGD Pilot, Built to Scale to 10 MGD

Solar SWRO, pond-based ZLD, and mineral recovery at Punta Banda, Baja California

How the Plant Is Designed

Solar-Powered Desalination

The pilot is three 0.33 MGD Toray SWRO trains (about 1 MGD), with partial redundancy for maintenance. The same architecture scales to 10 MGD. Power is 100% solar. Early water sales are to the municipality (CEA/CESPE), which needs the full pilot output.

Industrial Mineral Recovery

A high-recovery concentrator feeds lined evaporation ponds. Mechanical harvesting produces industrial-grade NaCl, with modest Mg(OH)₂ precipitation. No marine brine discharge.

Split-Campus Site

Coastal intake parcel of 5 acres or less (subsurface beach wells, pumps, control). Inland campus of 500 acres for the plant, solar field, ponds, and expansion to 10 MGD. Pilot operations are staged on the inland site.